iterFact for Joe — The 25-Day Delta
Built as an interactive document with 8 sections in the Obsidian Cyan theme.
The numbers that changed
March 22, 2026 → April 16, 2026. 25 days. No rewrites, no pivots, just sharper edges.
UX score bridge: 34 → 76
Each upgrade was an independent commit. Stacked, they moved the floor from operator-grade to product-grade.
25 days. Every move was load-bearing.
Not a feature list. A sequence where each shipped thing unlocked the next.
Current platform state
Live as of April 16, 2026
March 22 vs April 16 — capability by capability
Same platform. Same moat. Different front door. Different product.